The €233m investment is the largest capex contract since VINCI Airports invested in ANA Aeroportos de Portugal

 

ANA, a VINCI Airports subsidiary, has signed a contract with a consortium including Mota-Engil, VINCI Construction Grands Projets, Alves Ribeiro and HCI, to enhance the passenger experience and streamline operations at Lisbon airport.

The works are expected to be completed by 2027.

This investment plan involves: the expansion of Terminal 1 with a new 33,000m2 South Pier, the construction of ten boarding bridges and 12 aircraft parking stands; the remodelling of the existing Central Pier and the connection to the future South Pier; and the redesign of the South bus gates.

According to VINCI Airports, the Terminal 1 upgrade will: enhance passenger comfort by enlarging the terminal and boarding in direct contact with the terminal and providing direct access to aircraft; improve airport operational performance; and reduce the airport’s carbon footprint with high-energy-performance infrastructure and less vehicle traffic on the apron.

This investment is part of VINCI Airports’ drive to expand connections in Portugal while upgrading the quality of service it provides for passengers. ANA has invested €120m in the country’s airports in 2024 to date.

The Lisbon works are expected to be completed by 2027
The Lisbon works are expected to be completed by 2027 VINCI Airports