Alstef Group has been awarded the baggage handling system project for the expansion of Antalya Airport’s Terminal 2.
The expansion of both the departures and arrivals areas is set to be completed by the first quarter of 2025, the French firm said.
The departures expansion consists of 80 new check-in conveyors, four new screening lines with Standard 3 EDS (explosives detection systems), a new tilt-tray sorter, 36 chutes, and two new make-up carousels. The departure system will be monitored and controlled by the Alstef Group software suite, BAGware.
The arrivals section features five new inclined reclaim carousels with associated feed lines. The contract was awarded to Alstef France, Alstef Group’s subsidiary in Turkey, airport construction companies JV TAV Construction and Sera Yapı, and Fraport TAV Antalya (FTA), the terminal operator.
Alstef Group will manage all work on-site through its subsidiary in Turkey.
Image: Antalya Airport/ Alstef Group